- 20 jetbridges with 7 different kinds of connectors
- 8 different ground stair units (20 total), all crafted in resin
- Accurate detailing of the 2021 modernized design
- 3 large connecting pieces with connector slots
- Incredibly realistic floodlight lamps
- This model will take 3-4 weeks to make
- Planes and GSE not included
Pre-OrderAirport Terminals
1:400 Scale SeaTac International Airport North Satellite (2021) — Pre-Order
$799.00










/IMG_0030-300x300.jpeg)
/IMG_0008-300x300.jpeg)
/IMG_0411-300x300.jpeg)
Reviews
There are no reviews yet.